About us Beckerleg Cabling was formed in 1997 and has built up a client base which includes Local Health services, schools, colleges, Industry and Commerce |
|
![]() |
Our services A fast and efficient supplier of cabling solutions. Installation of high speed Cat5e and Cat6 structured cabling Fibre optic cabling Telephone cabling |
Data Cabling | |
![]() |
|
Our core business Cat5e and Cat6 6 form the basis for all high speed office and organisational IT cabling solutions Beckerleg Cabling is able to manage all sizes of structured cabling installation projects from initial enquiry through to commissioning and handover for projects ranging from one outlet through to a complete headquarters installation of several hundred outlets and thereafter support continues with moves, changes and installation of additional outlets as required. |
|
Fibre optic cabling | |
![]() |
|
The point to point solution Installation of single mode and multi-mode fibre optics for longer distance and external applications. |
|
Telephone cabling | |
![]() |
|
Internal cabling Multi-core point to point External, armoured cable routed through underground pipes or suspended from overhead catenary |
Case Study 1
To re-cable data and voice services at Essex Ambulance HQ Emergency room whilst
keeping disruption to the emergency services at a minimum.
This was achieved by setting up a temporary working area for 3 staff members.
Staff members were then rotated to allow the work to be undertaken one area at a
time.
All cabling was run in the false floor, loomed and colour coded to supply each
staff member with 10 voice/data outlets. Total number of outlets 240.
Working with the IT staff of Essex Ambulance and the electrical contractors to
a plan of operation the whole emergency room was re-cabled whilst being fully
operational.
Case Study 2
A Maldon engineering company required their communications cabling migrated from
the ground floor to a new server room on the first floor.
With a team of four we started at close of business on a Friday evening
Working over the weekend 500 cables were transferred and terminated to the new
site.
Cabling that was too short was replaced along its complete length.
All outlets were tested and re-patched to the voice and data services.
All communications were complete.
The company was then ready for business first thing Monday morning.