Beckerleg Cabling Services Limited
Data and voice Structured networks

Phone 01376 518471
Mobile 07702997351
Email Davidbeckerleg@btinternet.com

About us
Beckerleg Cabling was formed in 1997 and has built up a client base which includes Local Health services, schools, colleges, Industry and Commerce
 
Our services
A fast and efficient supplier of cabling solutions.
Installation of high speed Cat5e and Cat6 structured cabling
Fibre optic cabling
Telephone cabling
 
Data Cabling
Our core business
Cat5e and Cat6 6 form the basis for all high speed office and organisational IT cabling solutions
Beckerleg Cabling is able to manage all sizes of structured cabling installation projects from initial enquiry through to commissioning and handover for projects ranging from one outlet through to a complete headquarters installation of several hundred outlets and thereafter support continues with moves, changes and installation of additional outlets as required.
 
Fibre optic cabling
The point to point solution
Installation of single mode and multi-mode fibre optics for longer distance and external applications.
 
Telephone cabling
Internal cabling
Multi-core point to point
External, armoured cable routed through underground pipes or suspended from overhead catenary

Case Study 1
To re-cable data and voice services at Essex Ambulance HQ Emergency room whilst keeping disruption to the emergency services at a minimum.
This was achieved by setting up a temporary working area for 3 staff members. Staff members were then rotated to allow the work to be undertaken one area at a time.
All cabling was run in the false floor, loomed and colour coded to supply each staff member with 10 voice/data outlets. Total number of outlets 240.
Working with the IT staff of Essex Ambulance and the electrical contractors to a plan of operation the whole emergency room was re-cabled whilst being fully operational.

Case Study 2
A Maldon engineering company required their communications cabling migrated from the ground floor to a new server room on the first floor.
With a team of four we started at close of business on a Friday evening
Working over the weekend 500 cables were transferred and terminated to the new site.
Cabling that was too short was replaced along its complete length.
All outlets were tested and re-patched to the voice and data services.
All communications were complete.
The company was then ready for business first thing Monday morning.